You are hereTriple Bypass Home / Evergreen Short Tour - Warm up ride the day before the Triple Bypass
Evergreen Short Tour - Warm up ride the day before the Triple Bypass
Meet at the Bergen Park Park & Ride at 9:30 pm
Bergen Park, Sugarbush, Keystone, Bergen Parkway, Evergreen Parkway (Colo.74), El Rancho, Highway 40, Colo. 65, Alta Vista, Meadow Vista, Soda Creek, Woodland, Colo. 65, Bergen Park.
From Bergen Park ride east on Colo. 65 ½ mile through the roundabout to the first stoplight. Make a right turn onto Sugarbrush (Next to McDonalds. Follow Sugarbrush 2 miles as it winds through Hiwan Hills to the intersection with Keystone. Turn right (north) on Keystone and ride 1.5 miles to the intersection with Bergen Parkway (Old 74). Turn right on Bergen Parkway and ride through the roundabout again, past McDonalds to the stoplight at Evergreen Parkway (Highway 74). Turn right (east) on Evergreen Parkway and ride 2 miles to El Rancho. Turn left onto Highway 40 at El Rancho and ride west 4 miles to the intersection with Colo. 65. Turn left (south) on Colo. 65 and ride ½ mile to Alta Vista Dr. Turn left on Alta Vista and ride 2 miles on Alta Vista & Meadow Vista to the intersection of Colo. 65 and Soda Creek Dr. Cross Colo. 65 and ride Soda Creek Dr. 2 miles to Woodland Dr. Follow Woodland Dr. & Meadow Mtn. Rd 1.5 miles back to Colo. 65. Turn right (east) on Colo. 65 and ride ½ mile back to the Bergen Park Park & Ride.
Round trip: 16.5 miles 1,800 ft. elevation gain.